Roll back a bad update

A patch went out and something broke. Rollback in Praxis is never automatic; it is an explicit, approved, staged lifecycle, for the same reason the patch was.

First: stop the bleeding

Before starting a rollback, stop the damage spreading.

  1. Do not dispatch the next wave. If the plan is mid-flight, leave later waves undispatched.
  2. Note which hosts already took the change. The plan execution shows per-host state.

If the problem is limited to one host and you can fix it in place faster than you can run a rollback, do that. Rollback is for the case where the change itself was wrong.

The rollback lifecycle

Open the plan execution: Update > Update Plans, the plan, then its execution, then the Rollback panel.

  1. Evaluate. Praxis computes rollback feasibility for the execution. Read this before anything else; it tells you what can actually be reversed.
  2. Request approval. A feasibility summary and a frozen plan preview go to an approver. Approvers vote.
  3. Start dispatch. Once approved, rollback begins, batch by batch.
  4. Dispatch next batch, or cancel. You advance cohort by cohort, watching per-host state, and you can stop.
  5. Verify. After the rollback completes, verification confirms hosts are back at the intended state.

The frozen plan preview reflects the approval snapshot, not live package state, so an approver reviews exactly what will be undone.

What rollback does not do

  • It does not undo control plane state. If the newer version completed work, that work stands.
  • It does not reverse a reboot or anything the updated software did while it was running, such as a data migration performed by an application package.
  • It cannot recover a package version the host can no longer obtain. If the previous version has been removed from the repository your host points at, rollback has nothing to install. Mirrors you control avoid this; see mirrors and content.

Rollback restores packages. It does not restore state. For anything stateful, your restore path is the host backup, not Praxis.

Rolling back the agent

The agent is separate from the patch lifecycle. To move a host back to a previous agent, run sudo ./install.sh from the older verified tarball. Identity material survives, so no re-enrollment is needed. See upgrade.

Rolling back the control plane

Also separate. See upgrade for redeploying previous image digests and the database constraint that governs whether you can.

Afterwards

  • Confirm the affected hosts are healthy and inventory reflects the reverted versions.
  • Narrow the patch policy scope, or reorder the rings, so the same change cannot reach the whole fleet next time.
  • The rollback request, its approval, and the per-host dispatch results are all audited. Export them if this needs a change record. See export evidence for an audit.